Register information Patent

DE file number : 11 2022 000 167.4 (Status: pending/in force, Query started: August 7, 2025)

Please note: This English version is a non-binding translation of the German register excerpt. Only the German version of the register excerpt is legally binding.

Master data
INIDCriterionFieldContent
Type of IP rightSARTPatent
StatusSTPending/in force
21DE file number DAKZ11 2022 000 167.4
86WO file numberWAKZPCT/JP2022/021068
87WO publication numberWPN2022255139
54Designation/titleTIHALBLEITEREINRICHTUNG
51IPC main classICM
(ICMV)
H10D 80/20 (2025.01)
51IPC secondary class(es)ICS
(ICSV)
H01L 23/488 (2006.01), H01L 21/60 (2006.01), H01L 25/18 (2023.01)
22DE application dateDATMay 23, 2022
85PCT national phase entry patentPATNATMay 30, 2023
86WO application dateWATMay 23, 2022
43Date of first publicationOTDec 8, 2022
71/73Applicant/ownerINHFUJI ELECTRIC CO., LTD., Kawasaki-shi, Kanagawa, JP
72InventorINYamano, Akio, Kawasaki-shi, Kanagawa, JP
74RepresentativeVTRBOEHMERT & BOEHMERT Anwaltspartnerschaft mbB - Patentanwälte Rechtsanwälte, 28359 Bremen, DE
10Published DE documentsDEPNOriginal document: DE112022000167T5
Searchable text: DE112022000167T5
Address for service BOEHMERT & BOEHMERT Anwaltspartnerschaft mbB - Patentanwälte Rechtsanwälte, 28359 Bremen, DE
33
31
32
Foreign priorityPRC
PRNA
PRDA
JP
2021-094169
Jun 4, 2021
Due dateFT
FG
May 31, 2026
Annual fee for the 5th year Patent fees
Patent division in charge 36
87WO language of publicationWLANGJP - Japanisch
57AbstractABA semiconductor device comprising a first conductive pattern and a second conductive pattern which are provided on a main surface of an insulating substrate, and a first semiconductor element and a second semiconductor element which are each disposed on the first conductive pattern. The first conductive pattern includes a first input region overlapping the first semiconductor element, and a second input region overlapping the second semiconductor element. An output electrode of the first semiconductor element and an output electrode of the second semiconductor element are interconnected by means of a first wiring member. An output electrode of the second semiconductor element and the second conductive pattern are interconnected by means of a second wiring member. The ratio of a current that flows from the second input region to the second conductive pattern via the second semiconductor element, with respect to a current that flows from the first input region to the second conductive pattern via the first semiconductor element, is 0.90 to 1.10 inclusive.
81Designated WO countriesWDSAE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DJ, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IQ, IR, IS, IT, JM, JO, JP, KE, KG, KH, KN, KP, KR, KW, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, WS, ZA, ZM, ZW
Published EP/WO documentsEPWOPNOriginal document: WO002022255139A1
Searchable text: WO002022255139A1
43Date of first publicationEVTDec 8, 2022
Number of official communications (office actions) 0
Number of responses 0
Date of the first transfer into DPMAregisterEREGTJul 27, 2023
Date of the (most recent) update in DPMAregisterREGTJun 12, 2025
(Show all update days)(Hide all update days)
  • Jun 12, 2025
    • Due date: changed
  • Jun 8, 2025
    • St.36: changed (technical change)
  • Jan 2, 2025
    • IPC main class: changed
    • IPC secondary class(es): changed
    • Procedures: Change of classification, Change of IPC main class, 22.11.2024: new
  • Sep 4, 2024
    • St.36: changed (technical change)
  • Jul 27, 2023
    • Date of the first transfer into DPMAregister
Procedural data
No.Kind of procedureLegal statusDate of legal/procedural statusPublication dateAlle Details anzeigen
1 Pre-registration procedure The application is under preliminary examination May 23, 2022  Details anzeigen
2 Procedure relating to PCT application WO first publication with search report Dec 8, 2022  Details anzeigen
3 Examination procedure Request for examination effectively filed May 30, 2023  Details anzeigen
4 Pre-registration procedure Pre-registration procedure has been concluded Jun 19, 2023  Details anzeigen
5 Pre-registration procedure Closing PCT nationale phase entry Jun 19, 2023  Details anzeigen
6 Publications Publication of translation of PCT application Jul 27, 2023 Jul 27, 2023 Details anzeigen
7 Change of classification Change of IPC main class Nov 22, 2024 Jan 2, 2025 Details anzeigen
View procedures Pre-registration procedure (No.: 1)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTThe application is under preliminary examination
Date of legal/procedural statusVSTTMay 23, 2022
Date of update of the procedureREGTJul 27, 2023
View procedures Procedure relating to PCT application (No.: 2)
INIDCriterionFieldContent Close details
Type of procedureVARTProcedure relating to PCT application
Legal/procedural statusVSTWO first publication with search report
Date of legal/procedural statusVSTTDec 8, 2022
Date of update of the procedureREGTJul 27, 2023
View procedures Examination procedure (No.: 3)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTRequest for examination effectively filed
Date of legal/procedural statusVSTTMay 30, 2023
Third party request No
Date of receiptAEGTMay 30, 2023
Date of update of the procedureREGTJul 27, 2023
View procedures Pre-registration procedure (No.: 4)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTPre-registration procedure has been concluded
Date of legal/procedural statusVSTTJun 19, 2023
Date of update of the procedureREGTJul 27, 2023
View procedures Pre-registration procedure (No.: 5)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTClosing PCT nationale phase entry
Date of legal/procedural statusVSTTJun 19, 2023
Date of update of the procedureREGTJul 27, 2023
View procedures Publications (No.: 6)
INIDCriterionFieldContent Close details
Type of procedureVARTPublications
Legal/procedural statusVSTPublication of translation of PCT application
Date of legal/procedural statusVSTTJul 27, 2023
Issue numberHN30
YearPJ2023
Publication dateVTJul 27, 2023
Type of publicationPARTDocuments
PartHTPart 6
10Published DE documentsDEPNOriginal document: DE112022000167T5
Searchable text: DE112022000167T5
Date of update of the procedureREGTJul 27, 2023
View procedures Change of classification (No.: 7)
INIDCriterionFieldContent Close details
Type of procedureVARTChange of classification
Legal/procedural statusVSTChange of IPC main class
Date of legal/procedural statusVSTTNov 22, 2024
Issue numberHN1
YearPJ2025
Publication dateVTJan 2, 2025
Type of publicationPARTBibliographic data
PartHTPart 2
51IPC main classICM
(ICMV)
H10D 80/20 (2025.01)
51Previous IPC main classICMF
(ICMVF)
H01L 25/07 (2006.01)
Date of update of the procedureREGTJan 2, 2025