Register information Patent

DE file number : 11 2016 002 390.1 (Status: pending/in force, Query started: August 4, 2025)

Please note: This English version is a non-binding translation of the German register excerpt. Only the German version of the register excerpt is legally binding.

Master data
INIDCriterionFieldContent
Type of IP rightSARTPatent
StatusSTPending/in force
21DE file number DAKZ11 2016 002 390.1
86WO file numberWAKZPCT/US2016/032833
87WO publication numberWPN2016191147
54Designation/titleTIHebewerkzeuganordnung
51IPC main classICM
(ICMV)
F16C 35/06 (2006.01)
51IPC secondary class(es)ICS
(ICSV)
B66F 3/30 (2006.01)
22DE application dateDATMay 17, 2016
85PCT national phase entry patentPATNATNov 27, 2017
86WO application dateWATMay 17, 2016
43Date of first publicationOTDec 1, 2016
Date of publication of grantPETJan 3, 2019
71/73Applicant/ownerINHSiemens Energy, Inc., Orlando, Fla., US
72InventorINCisloiu, Cezar, Monroeville, Pa., US; Edwards, James B., Sanford, Fla., US
74RepresentativeVTRisarpatent - Patent- und Rechtsanwälte PartG mbB, 80801 München, DE
10Published DE documentsDEPNOriginal document: DE112016002390B4
Searchable text: DE112016002390B4
Original document: DE112016002390T5
Searchable text: DE112016002390T5
Address for service isarpatent- Patent- und Rechtsanwälte PartG mdB, 80801 München, DE
33
31
32
Foreign priorityPRC
PRNA
PRDA
US
14/722,210
May 27, 2015
Due dateFT
FG
May 31, 2026
Annual fee for the 11th year Patent fees
Patent division in charge 12
87WO language of publicationWLANGEN - Englisch
57AbstractABA lifting tool (60) for lifting a rotor (12, 28) associated with a generator so as to allow a rotor bearing (16) to be removed from a bearing pedestal (22, 32) beneath the rotor (12, 28). The tool (60) includes a semi-circular base portion (64) that is bolted to the bearing pedestal (22, 32) and a pair of jack screws (84, 86) mounted to the base portion (64). A hydraulic ram (94) is mounted to the base portion (64) between the jack screws (84, 86) and is positioned against the rotor (12, 28) when the tool (60) is bolted to the bearing pedestal (22, 32). The ram (94) is used to lift the rotor (12, 28) away from the bearing (16) and the jack screws (84, 86) are used to hold the rotor (12, 28) up once it is in the desired location, where the ram (94) is then lowered.
81Designated WO countriesWDSAE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JP, KE, KG, KN, KP, KR, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW
Published EP/WO documentsEPWOPNOriginal document: WO2016191147A1
Searchable text: WO2016191147A1
56CitationsCT JP002012062872A (JP 2012- 62 872 A)
JP000S60237224A (JP S60- 237 224 A)
JP000002504127Y2 (JP 2 504 127 Y2)
JP0000S6154846A (JP S61- 54 846 A)
JP002014240645A (JP 2014- 240 645 A)
JP002011021541A (JP 2011- 21 541 A)
43Date of first publicationEVTDec 1, 2016
Number of official communications (office actions) 1
Number of responses 1
Date of the first transfer into DPMAregisterEREGTFeb 15, 2018
Date of the (most recent) update in DPMAregisterREGTJun 12, 2025
(Show all update days)(Hide all update days)
  • Jun 12, 2025
    • Due date: changed
  • May 15, 2025
    • Representative: changed
    • Address for service: changed
  • Aug 16, 2024
    • St.36: changed (technical change)
  • Feb 15, 2018
    • Date of the first transfer into DPMAregister
Procedural data
No.Kind of procedureLegal statusDate of legal/procedural statusPublication dateAlle Details anzeigen
1 Pre-registration procedure The application is under preliminary examination May 17, 2016  Details anzeigen
2 Procedure relating to PCT application WO first publication with search report Dec 1, 2016  Details anzeigen
3 Examination procedure Request for examination effectively filed Nov 27, 2017  Details anzeigen
4 Pre-registration procedure Pre-registration procedure has been concluded Jan 4, 2018  Details anzeigen
5 Pre-registration procedure Closing PCT nationale phase entry Jan 4, 2018  Details anzeigen
6 Publications Publication of translation of PCT application Feb 15, 2018 Feb 15, 2018 Details anzeigen
7 Examination procedure Official communication on examination Apr 25, 2018  Details anzeigen
8 Examination procedure Reply to official communication Aug 24, 2018  Details anzeigen
9 Examination procedure Decision to grant patent by Examining Section/Patent Division Sep 19, 2018  Details anzeigen
10 Publications Patent specification Jan 3, 2019 Jan 3, 2019 Details anzeigen
11 Examination procedure Grant of patent has become final Oct 5, 2019 Dec 12, 2019 Details anzeigen
View procedures Pre-registration procedure (No.: 1)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTThe application is under preliminary examination
Date of legal/procedural statusVSTTMay 17, 2016
View procedures Procedure relating to PCT application (No.: 2)
INIDCriterionFieldContent Close details
Type of procedureVARTProcedure relating to PCT application
Legal/procedural statusVSTWO first publication with search report
Date of legal/procedural statusVSTTDec 1, 2016
View procedures Examination procedure (No.: 3)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTRequest for examination effectively filed
Date of legal/procedural statusVSTTNov 27, 2017
Third party request No
Date of receiptAEGTNov 27, 2017
View procedures Pre-registration procedure (No.: 4)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTPre-registration procedure has been concluded
Date of legal/procedural statusVSTTJan 4, 2018
View procedures Pre-registration procedure (No.: 5)
INIDCriterionFieldContent Close details
Type of procedureVARTPre-registration procedure
Legal/procedural statusVSTClosing PCT nationale phase entry
Date of legal/procedural statusVSTTJan 4, 2018
View procedures Publications (No.: 6)
INIDCriterionFieldContent Close details
Type of procedureVARTPublications
Legal/procedural statusVSTPublication of translation of PCT application
Date of legal/procedural statusVSTTFeb 15, 2018
Issue numberHN7
YearPJ2018
Publication dateVTFeb 15, 2018
Type of publicationPARTDocuments
PartHTPart 6
10Published DE documentsDEPNOriginal document: DE112016002390T5
Searchable text: DE112016002390T5
View procedures Examination procedure (No.: 7)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTOfficial communication on examination
Date of legal/procedural statusVSTTApr 25, 2018
View procedures Examination procedure (No.: 8)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTReply to official communication
Date of legal/procedural statusVSTTAug 24, 2018
View procedures Examination procedure (No.: 9)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTDecision to grant patent by Examining Section/Patent Division
Date of legal/procedural statusVSTTSep 19, 2018
View procedures Publications (No.: 10)
INIDCriterionFieldContent Close details
Type of procedureVARTPublications
Legal/procedural statusVSTPatent specification
Date of legal/procedural statusVSTTJan 3, 2019
Issue numberHN1
YearPJ2019
Publication dateVTJan 3, 2019
Type of publicationPARTDocuments
PartHTPart 3
10Published DE documentsDEPNOriginal document: DE112016002390B4
Searchable text: DE112016002390B4
View procedures Examination procedure (No.: 11)
INIDCriterionFieldContent Close details
Type of procedureVARTExamination procedure
Legal/procedural statusVSTGrant of patent has become final
Date of legal/procedural statusVSTTOct 5, 2019
Issue numberHN50
YearPJ2019
Publication dateVTDec 12, 2019
Type of publicationPARTBibliographic data
PartHTPart 3